CLIENT

Eureka Funds Management

ADDRESS

Levels 2,3 & 8, 55 Clarence St Sydney

PROJECT SIZE

2,000 SQM

PROJECT VALUE

$1.5M

PROJECT OVERVIEW

Sense Projects won this competitive tender for the office and lift lobby (including design and construction of an accessible bathroom & shower) make good and refurbishment to Levels 2 &3, 55 Clarence Street, Sydney. This included the make good, refurbishment and partial fit-out of the L8 Suite, to be undertaking concurrently with the Level 2 and 3 works. Refurbishment works included the refurbishment of all ceilings, wall finishes, floor finishes, FF&E, signage, blinds and the bathrooms. All services were designed to meet the requirements of the architectural design, in particular, the accessible bathroom and shower.

The level 2 & part of level 8 fit-out included a new reception area and kitchenette; open plan workspace with ‘pod’ style workstations and a meeting room. This was an integrated fit-out for both levels 2 & 3 to include base build refurbishment, landlord’s security, services and finishes. The client was very happy with the end result being an open, light and bright space with a central meeting  client-facing area adjacent to the breakout area